• Maroun field:
    -Constructed
      production unit 2 with a 100,000 bbl/day capacity
  • Maroun field:
    -Upgraded the Marun 2 production unit with 200,000 bbl/day capacity
    -Laying of LNG pipeline to prod. Unit #4
    -Laying of
      80 km pipeline from Ahvaz to prod. Unit #1
  • Kharg island:
    Upgraded production Unit #1 to 200,000 bbl/day 
  • Gachsaran field:
    Upgraded production unit #1 from 100,000 to 200,000 bbl/day
    Expansion of prod. Unit 2 & 3 from 200,000 to 500,000 bbl/day.
  • Agha Jari field:
    –Laying of 35km 24 inch pipeline from unit#2 to the pumping station.
  • Lavan island:
    –Construction of production unit#1 with a 100,000 bbl/day .
  • Goreh:
    –Erection of booster station including three 8000hp engines boosting 1.5 million bbls of crude to Kharg island export terminal.
 

 

 

 

 

 

 

 

 Copyright Karoun Drilling & Field Services © 2004.All Rights Reserved.
Site best viewed with browser versions Netscape 6.1, Microsoft IE 5.0 and
Mozilla 1.2 and above and with screen resolution 1024x768.
Design by Kaamal Taheri / Develop by Babak Ghiasi